For construction contractors
Where the industrial construction work is in 2026
Overall U.S. construction spending is down. Total spending ran at a $2,186 billion annual rate in September 2026, 2.7% below a year earlier (U.S. Census Bureau, released Nov 2, 2026). A few industrial sectors are growing fast, though, and they lean hard on electrical, mechanical and piping trades. This page shows where the money is going and links to a page for each sector and area.
Crossbrace Capital is a sister company of Funding Futures. We're a direct funder for construction contractors and work with them remotely. Crossbrace Capital isn't affiliated with any company or project named on this page.
5 taps. No contact details to see your number.
Check your cash gap
Up to 5 taps to an estimate. No contact details needed to see it.
Let's size the cash gap on a job. 5 taps at most, and you don't need to give contact details to see the number. Nothing is sent to us until you press Send at the end.
Your request is handled by Crossbrace Capital and its sister company Funding Futures, and either may call or email you about it. We do not sell your information. By pressing Send my request, I confirm I'm authorized to request business funding for this business and that it's for business purposes only. Automated calls and texts happen only if I checked those boxes. Privacy Policy · Terms · Disclosures
Spending by sector
Private construction spending, September 2026 vs September 2025, seasonally adjusted annual rate (Census, private construction table, released Nov 2, 2026):
| Sector | Sep 2026 | Sep 2025 | Change |
|---|---|---|---|
| Power (incl. gas and oil) | $171.7B | $153.1B | +12% |
| Data centers | $96.5B | $50.7B | +90% |
| Manufacturing (all) | $167.2B | $203.7B | −18% |
| of which chip, electronics and battery plants | $52.6B | $90.2B | −42% |
| of which chemical and pharma plants | $43.0B | $42.0B | +2% |
| Warehouses | $51.6B | $56.1B | −8% |
What this means: power is the biggest growing category and data centers the fastest growing. Chip and battery plant spending is falling as the big buildings finish, but the work moving inside them (cleanrooms, process piping, electrical) is still trade-heavy.
By sector
- Power plants, substations and transmission: gas plants, nuclear restarts and grid work. Heavy on electrical, I&C, pipefitting and civil.
- Data centers: the fastest-growing category. Electrical systems are 48–54% of construction cost and mechanical 22–33%, per Turner & Townsend's 2025 index (ConstructConnect, Sep 2, 2026).
- Chip fabs: fewer new shells, more fit-out: cleanrooms, process piping and electrical.
- LNG and petrochemical: multi-year Gulf Coast builds. Pipe, steel, insulation and electrical.
- Pharma and advanced manufacturing: clean utilities, process piping and HVAC.
By area
| Area | What's building | Page |
|---|---|---|
| Phoenix metro, AZ | Chip fabs, a battery plant, data centers | Phoenix metro |
| Central Ohio | Data centers, Intel's first Ohio fab | Central Ohio |
| Boise, ID | Two memory fabs | Boise |
| Lake Charles and Cameron, LA | LNG export terminals | LNG and petrochemical |
| Northern Virginia | Data centers | Northern Virginia |
| Richland Parish and Monroe, LA | A 5 GW data-center campus | Richland Parish and Monroe |
| Memphis and Southaven | Data centers | Memphis and Southaven |
| Raleigh-Durham and eastern NC | Pharma plants, data centers | North Carolina |
| Syracuse, NY | A memory megafab | Syracuse |
| Northern Indiana | Data centers | Northern Indiana |
Why big industrial jobs stretch a contractor's cash
- You buy before you bill. Switchgear, generators, pipe and copper are often bought months before the first pay app. Read long-lead equipment deposits.
- Payment runs down a long chain. Owner to GC or EPC, to tier-1 sub, to you. Read GC payment terms on data-center jobs; the same mechanics apply on plants and terminals.
- Retainage sits until the end. Read retainage on data-center jobs and retainage laws by state.
- Crews travel. Per diem and lodging start on day one. Read mobilizing a traveling crew.
Size your gap
Up to 5 taps, no contact details needed to see the number. Nothing is sent to us until you press Send.
Sources were checked November 18, 2026. Project plans change; check the linked source for the latest.