Plain-English definitions of the payment, legal and funding terms contractors run into. Terms are grouped by topic; use the A–Z bar to jump. Definitions are general information, not legal advice, and state laws vary.

Getting paid on a job

Pay app

Short for pay application: the monthly (or periodic) request for payment a contractor submits for work completed to date. On commercial jobs it's often prepared on AIA G702/G703 forms or the GC's own format. See also: schedule of values.

Schedule of values

The line-by-line breakdown of a contract price by task or phase, agreed at the start of the job. Each pay app bills a percentage complete against these lines.

Draw

A payment released from a project's funding, usually by the owner or the owner's lender, against completed work. Contractors often use "draw" and "pay app" interchangeably, though a draw technically refers to the money being released.

Retainage

A percentage of each payment held back until the job (or a phase) is complete, to make sure the work gets finished. Often 5–10%; many states cap it, especially on public work. See retainage laws by state.

Holdback

Another word for retainage, common in some regions and in Canada. It can also mean any amount withheld from a payment, such as for a disputed item.

Stored materials

Materials delivered and stored, on site or off site, but not yet installed. Some contracts let you bill for them before installation if you provide proof of delivery, insurance and title.

Mobilization

The costs and work needed to start a job: moving equipment, setting up the site, bonds, insurance and first orders. Some contracts include a mobilization line item you can bill early. See the mobilization cost checklist.

Unit price

A contract priced per unit of work (per cubic yard, per linear foot, per ton) rather than a lump sum. You're paid for measured quantities, so disagreements over measurements can delay payment.

Change order

A written change to the contract's scope, price or schedule. Unsigned change-order work usually can't be billed on a pay app.

Back-charge

A deduction the GC or owner takes from your payment for costs they say you caused, such as cleanup, damage or rework done by others.

Net terms

The number of days after an invoice or pay app within which payment is due, such as net 30 or net 60.

Haul ticket

The load record a trucking company gets signed at the site or scale, showing the material, quantity and time. Haulers invoice from their tickets, and missing or mismatched tickets delay payment.

Rough-in

The stage where pipe, conduit, duct or wiring is installed inside walls, floors and ceilings before they're closed up. Rough-in usually has to pass inspection before the next trade can cover it.

Substantial completion

The point when the work is complete enough for the owner to use it for its intended purpose, even if punch-list items remain. It often triggers retainage release and warranty periods.

Punch list

The list of small items to fix or finish near the end of a job. Completing it is usually required for final payment and retainage.

Commissioning

The process of testing and verifying that building systems (mechanical, electrical, controls) work as designed, often by a third-party commissioning agent. On mechanical jobs it can gate final payment.

Closeout

The end-of-job paperwork and steps: punch list, as-built drawings, O&M manuals, warranties, test reports and final lien waivers. Final payment and retainage usually wait on it.

Tier

A sub's level in the contract chain. A first-tier sub contracts with the GC; a second-tier sub contracts with a first-tier sub, and so on. Deeper tiers usually wait longer to be paid.

Protecting your right to be paid

Pay-when-paid

A contract clause that ties when the GC pays you to when the GC gets paid. Many courts read it as a timing rule: you still get paid within a reasonable time even if the owner doesn't pay. See pay-when-paid vs. pay-if-paid.

Pay-if-paid

A clause that makes the owner's payment to the GC a condition of the GC paying you, shifting the risk of owner nonpayment to the sub. Some states don't enforce these clauses.

Prompt payment law

A state or federal law that sets deadlines for paying contractors and subs, often with interest for late payment. Ohio, for example, requires a contractor to pay subs within 10 calendar days of receiving owner payment (Ohio Rev. Code § 4113.61, checked 2026-11-17).

Lien waiver

A document in which you give up lien rights for a payment, usually exchanged with each pay app. Types differ by whether they're conditional on payment and whether they're for progress or final payment (AIA Contract Documents, checked 2026-11-17).

Conditional lien waiver

A lien waiver that only takes effect once you actually receive the payment it describes. The safer type to sign before the money arrives.

Unconditional lien waiver

A lien waiver that takes effect when signed, whether or not you've been paid. Sign it only after the payment has cleared.

Final lien waiver

A waiver given with the last payment on a job, giving up lien rights for all work on the project. Check that retainage and approved change orders are included before signing.

Mechanics lien

A legal claim against a private property for unpaid labor or materials that improved it. Deadlines are strict and vary by state; in Ohio, for example, the affidavit on most commercial projects is due within 75 days of the last work (Ohio Rev. Code § 1311.06, checked 2026-11-17).

Preliminary notice

An early notice, required in many states, telling the owner (and others) that you're working on the project, to preserve lien rights. Names vary by state.

Notice of furnishing

Ohio's form of preliminary notice, generally due within 21 days of first furnishing labor or materials on many projects (Ohio Rev. Code § 1311.05, checked 2026-11-17).

Notice of commencement

A document the owner records at the start of a private project, listing the owner, property and lender. It's often the source for the names you need on preliminary notices.

Payment bond

A surety bond that guarantees subs and suppliers will be paid. On public jobs, where liens usually aren't available, a bond claim is often the main remedy.

Performance bond

A surety bond that guarantees the contractor will complete the work as agreed. It protects the owner, not the subs.

Miller Act

The federal law requiring payment and performance bonds on most federal construction contracts. A sub without a direct contract with the prime must give notice within 90 days of its last work to bring a payment-bond claim (40 U.S.C. § 3133, checked 2026-11-17).

Job accounting

Cash gap

The money you have out of pocket on a job at a given time: costs paid minus payments received. The highest point is the peak gap, the cash the job really needs. See the calculator.

Working capital

Current assets minus current liabilities; in plain terms, the cash and near-cash a business has to run on. For a contractor, it's what carries jobs until they pay. See how much working capital a job needs.

WIP schedule

A work-in-progress schedule: a report showing each open job's contract value, costs to date, billings to date and estimated profit. Sureties and lenders often ask for it.

Overbilling

Billing more on a job than the work completed so far. It brings cash in early but is a liability: that money has already been spent on work still to do.

Underbilling

Billing less than the work completed. It means you've financed the job yourself, and it widens the cash gap.

Bonding capacity

The total amount of bonded work a surety will back for a contractor, both per job and in total. It depends heavily on working capital and net worth.

Business funding terms

Revenue-based financing

Funding repaid from a share of the business's future revenue or receipts rather than on a fixed loan schedule. Terms and legal structure vary by provider and state.

Merchant cash advance

An agreement in which a provider buys a portion of a business's future receipts at a discount and is repaid from those receipts. It's structured as a purchase, not a loan; many state disclosure laws call it sales-based financing.

Remittance

The payments delivered back to a provider under an advance or revenue-based financing agreement, usually by daily or weekly ACH debit. See daily vs. weekly remittance.

Reconciliation

A contract process that adjusts fixed remittance payments to match the business's actual receipts, usually on request with bank statements.

Total repayment amount

The full dollar amount you'll pay back under a financing agreement, including all fees. The number to compare first.

Factor rate

A multiplier used to price some advances: the amount funded times the factor rate equals the amount to be repaid. It is not an interest rate and isn't directly comparable to one.

Estimated APR

An annualized cost figure some state disclosure laws require for commercial financing, including sales-based financing. It's estimated because the term depends on future receipts. See how to read a financing disclosure.

Factoring

Selling specific invoices to a factoring company, which advances most of the value now and collects from your customer. Best suited to businesses with creditworthy customers and clean invoices.

Line of credit

A revolving credit limit, usually from a bank, that you draw on and repay as needed, paying interest only on what you use. Usually the lower-cost option when you qualify.

Position

An advance's place in line among a business's funding agreements: first position, second position and so on. Later positions are generally riskier for providers and costlier for businesses.

Stacking

Taking an additional advance while earlier ones are still being repaid. See stacking risks explained.

ACH debit

An electronic withdrawal from your bank account through the ACH network, the usual way remittance is collected.

UCC-1 filing

A public notice, filed with the state, that a lender or provider claims an interest in some of your business assets or receivables. Later providers see it and line up behind it.

Confession of judgment

A contract clause in which the business agrees in advance to let the other side get a court judgment without a trial if it defaults. Several states restrict or ban these in small-business financing, including Texas for covered sales-based financing (Texas Finance Code ch. 398, checked 2026-11-17).