Direct business funding for construction contractors

The trades build it.
We fund the trades.

Crossbrace Capital is a direct funder for established trade contractors. We fund payroll and materials while pay apps, draws and retainage catch up, with weekly or daily payments, or with receivables financing against work you've already billed. Check your gap, and get a plain-dollar cost disclosure in states that require one.

Check your cash gap

Up to 5 taps to an estimate. No contact details needed to see it.

Let's size the cash gap on a job. 5 taps at most, and you don't need to give contact details to see the number. Nothing is sent to us until you press Send at the end.

Start

Prefer a regular form?

5 taps. No contact details to see your number.

Or send a request
Sprinkler fitter on a lift tightening a coupling on a red fire main (illustrative photo)
Illustrative photo
Example timeline: one job, first day to last dollarHypothetical example

Peak gap about $306,000 in week 10.

Job ends, week 16Your cash gap: 11 weeksRetainage still held
  1. Week 0Work starts
  2. Week 4Pay app in
  3. Week 10GC paid
  4. Week 11You're paid
  5. Week 25Retainage released

Hypothetical $480,000, 16-week job billed every 4 weeks on 45-day terms with 10% retainage.

  • Commercial contractors onlyWe don't fund consumers or household needs
  • No SSN to startThe first step asks about your business and the job
  • SMS consent is never precheckedYou choose whether we text you
  • Plain-dollar disclosureWritten cost disclosure where state law requires one

By area

Where the industrial construction work is in 2026

Power plants, data centers, chip fabs and LNG: where U.S. industrial construction is growing, what it means for trade contractors, and how to plan cash.

Spending by sector

  • Power (incl. gas and oil)+12%$171.7B Sep 2026 $153.1B Sep 2025
  • Data centers+90%$96.5B Sep 2026 $50.7B Sep 2025
  • Manufacturing (all)−18%$167.2B Sep 2026 $203.7B Sep 2025
  • of which chip, electronics and battery plants−42%$52.6B Sep 2026 $90.2B Sep 2025
  • of which chemical and pharma plants+2%$43.0B Sep 2026 $42.0B Sep 2025
  • Warehouses−8%$51.6B Sep 2026 $56.1B Sep 2025

Private construction spending, September 2026 vs September 2025, seasonally adjusted annual rate (Census, private construction table, released Nov 2, 2026).

What this means: power is the biggest growing category and data centers the fastest growing.

Where the work is

Crossbrace Capital isn't affiliated with any company or project named on this page. Sources were checked November 18, 2026. Project plans change; check the linked source for the latest.

Where the gap comes from

You pay out from day one. The money arrives weeks later.

On a typical commercial job, your costs start the first week, the first pay app goes in at the end of the month, and the check, minus retainage, arrives after the GC is paid.

  • Payroll runs weekly, whether the owner has approved the pay app or not.
  • Subs wait about 51 days on average to be paid (Billd 2026 Market Report).
  • 5 to 10% is held back as retainage, often your profit, until well after the job ends.

The numbers behind the gap

You're carrying your customers' schedule

51 days

Average time subcontractors reported waiting to be paid (days sales outstanding).

Billd 2026 Market Report

92%

Share of subcontractors who floated payroll out of pocket at least once in the past year.

Siteline, 2026

43%

Share who wait more than 90 days for final payment and retainage.

Siteline, 2026

If that sounds like your business, you are not doing anything wrong. You are carrying your customers' schedule on your balance sheet.

Contractor in a job-site office trailer marking up a printed schedule (illustrative photo)

Uses of funds

What contractors use funding for

  • Payroll before the first draw. Cover two to three payroll cycles while a pay app works its way through the GC and the owner.
  • Materials for a job you just won. Buy gear, wire, equipment or pipe without draining the account that runs your other jobs.
  • Mobilization. Trucks, rentals, fuel and setup costs that land before you can bill.
  • A slow season or a slow payer. Bridge a predictable dip, or a customer who is 30 days late on finished work.
  • Equipment repairs. Get a truck or machine back on the job.

What we fund

Two ways we fund contractors

We're a direct funder, so the funding decision is ours. Choose the structure that matches how your money comes in.

Business funding, paid back weekly or daily

A lump sum for payroll, materials or mobilization, repaid from your business deposits on a set schedule. For contractors we lead with weekly payments: one payment a week is easier to plan around a weekly payroll and monthly pay-app checks. Daily is available if it suits your deposits.

Daily vs weekly remittance

Receivables financing

Funding based on invoices and pay apps you've already billed but haven't been paid on yet. It's built for the contractor waiting on one large check from one GC, where an advance repaid from deposits isn't the right tool.

How the options compare

How it works

Three steps, and you decide at every one

  1. Tell us about the business

    A short online request: your trade, time in business, typical monthly deposits, what the money is for and how much you need. No SSN, date of birth or bank login to start.

  2. We review and talk it through

    A person at Crossbrace Capital or its sister company Funding Futures reviews your request and contacts you about next steps. We'll ask about the job, your customers and your pay terms. If we need bank statements, we'll tell you why and how to send them securely.

  3. You review the offer

    If there's a fit, you get a written offer to review before you sign, with a plain-dollar cost disclosure in states that require one. If there isn't a fit, we'll tell you that too.

Free tool

See the whole job, week by week

The full calculator adds materials, billing frequency, retainage and release timing, then charts cash out, cash in and your running gap.

The calculator shows your cash gap only. It is not a funding offer.

Hypothetical example

$480,000 electrical scope, 16 weeks. $15,000 weekly payroll, 40% materials, monthly pay apps paid in 45 days, 10% retainage.

Cash in, cash out and your running cash position, week by weekGrey bars below the line are what you pay out each week. Green bars above the line are payments received. The amber area is your running cash gap, deepest in week 10 at $306K. The week-by-week table below lists every number.-$400K-$200K$0$200KPeak gap $306K, week 101357911131517192123252729week
Paid out that weekPayment receivedRetainage releasedRunning cash positionYour cash gap

Honest fit

When an advance is not the right tool

We'd rather tell you now than after you've signed. An advance repaid weekly or daily from your deposits usually isn't the best fit if:

  • One GC owes you most of what you're waiting on. If the gap is a single large invoice or pay app, our receivables financing usually fits better, because it's based on the work you've already billed. Ask about it when we talk.
  • The business is less than 1 year old. One year in business is our minimum.
  • Every job is losing money. Funding would only delay that problem.
  • A bank line of credit is available to you at a lower cost. Use it.

Not sure? Read Cash advance vs line of credit vs factoring

Before you sign

What you see before you sign

Every offer should answer four questions in plain dollars.

Funding amountThe money that lands in your account, after any fees taken out up front
Total repaymentEvery dollar you'll pay back, start to finish
Payment amount and frequencyHow much is taken, and whether it's daily, weekly or another schedule
Early payoffWhether paying early lowers the total, and by how much

Several states, including New York, California, Virginia, Georgia, Florida, Texas and Louisiana, require commercial financing providers to give a written disclosure with an offer. Learn to read one line by line.

Who we are

Crossbrace Capital is a direct funder. We fund established trade contractors across the U.S. for the gap between doing the work and getting paid, and the funding decision is ours. Availability depends on your state's rules; we'll tell you up front if we can't fund where you are. Required disclosures are provided in states that require them; see our Disclosures page.

More about us

Tell us about the job. We'll tell you honestly if we can help.

No SSN, date of birth or bank login to start.

ISO or broker? Use the partner page.

Check cash gapCall