Why payroll comes before the money
On most commercial jobs, you get paid through a chain:
- You submit a pay application for work completed through the billing date, usually monthly.
- The GC rolls your pay app into theirs and submits it to the owner.
- The architect or owner's rep reviews and approves it.
- The owner pays the GC.
- The GC pays you, minus retainage.
Each link takes time. Subcontractors report waiting 51 days on average to be paid (Billd 2026 Market Report). Meanwhile, the work in that pay app was done over the previous four weeks, so the first labor in a billing period may be 80+ days old by the time it's paid.
Then retainage, typically 5–10% of each payment (Breva 50-state survey), is held until the job, or your part of it, is finished. And if your subcontract has a pay-if-paid clause, the GC may not owe you until the owner pays them. Read pay-when-paid vs pay-if-paid.
None of that changes the fact that payroll is weekly. That's the gap.
Step 1: Map the gap by week
Most owners know the gap exists. Few know its size or when it peaks, and that's what decides which fix works.
For each active job, write down:
- Weekly payroll for the crew on that job, loaded (wages plus payroll taxes, workers' comp, benefits).
- Material and equipment costs and the week you actually pay for them (or when your supplier terms come due).
- Billing dates: when each pay app goes in.
- Payment terms: how many days after the pay app you're realistically paid, not what the contract says. Use your actual history with that GC.
- Retainage percentage and when it's realistically released.
Then add it up week by week: cash out, cash in, running total. The lowest point of that running total is your peak cash gap.
Example (hypothetical): A 16-week, $480,000 electrical scope with $15,000/week payroll, 40% materials (half bought up front), monthly billing, 45-day pay and 10% retainage has a peak gap of about $306,000 in week 10, the week before the first check arrives. The job's $48,000 margin equals the retainage, so the profit doesn't show up until about week 25. Add 15 days to the pay terms and the peak rises to about $348,000 in week 12.
Do it in two minutes: Our free contractor cash-gap calculator does this math for one job and shows the peak week. No email needed.
Two things to look for:
- Overlapping jobs. The gap on a new job lands on top of the gap on the job you're finishing. The peak of the whole business can be bigger than any single job.
- Your slowest payer. Run the map again with your slowest GC's actual pay history. That's your realistic case.
Step 2: Pull the free levers first
Before you pay anyone for money, use the levers that cost nothing or close to it.
Bill sooner and cleaner.
- Submit pay apps on the first day allowed, with every backup document the GC asks for. A rejected or late pay app pushes payment a full cycle.
- Bill for stored materials if your contract allows it. Gear sitting in your yard or a bonded warehouse can often be billed before it's installed, with proof of insurance and title.
- Get change orders signed before doing the work, so they can go on the next pay app.
Use your supplier's money.
- Ask your electrical or mechanical distributor for net 30 or net 60 terms, or longer terms on a large order. Moving a material payment 30 days later can shift your peak.
- On big orders, ask about joint checks (the GC pays you and the supplier together), which can make suppliers more willing to extend terms.
Negotiate before you sign the next sub.
- Ask for a mobilization line item or a deposit on long-lead equipment. It's rare, but it's free to ask.
- Push back on pay-if-paid language and high retainage, especially on private work where state caps may not apply.
Talk to the GC early. If a payment is going to be late, a call to the project manager or the GC's AP department before the due date sometimes moves your check up the stack. Keep it factual: the pay app number, the approved amount, the date it was due.
Stretch carefully, not dangerously. Do not delay payroll tax deposits to cover wages. Anyone responsible for paying withheld payroll taxes who willfully fails to do so can be personally liable for the Trust Fund Recovery Penalty (IRS). Talk to your CPA before you consider anything in this area.
Step 3: Compare outside options by total cost
If the free levers don't close the gap, you need outside money. Compare every option the same way: total dollars to repay, the payment schedule, and how fast you can actually get it.
| Option | How it works | Typical fit for payroll gaps | Watch out for |
|---|---|---|---|
| Bank line of credit | Draw what you need, repay, draw again. Interest on what you use. | Usually the lowest cost if you qualify. Best set up before you need it. | Takes time to open; needs financials; may be limited by your bank's view of your backlog. |
| SBA CAPLine (contract line) | A line tied to specific contracts. | Larger contracts where the bank will take an assignment of contract proceeds (SBA SOP, as republished). | Paperwork; GCs may not accept assignment. |
| Invoice factoring | A factor buys or advances against approved invoices. | One or a few large, approved invoices from creditworthy GCs. | Many factors avoid construction because of retainage and pay-if-paid; GC notification. |
| Material or supplier financing | A third party pays your supplier; you repay on longer terms. | When the gap is mostly materials. | Covers materials only, not labor. |
| Business credit card | Revolving credit. | Small, short gaps. | High rates if carried; low limits. |
| Revenue-based advance | A provider advances a lump sum and is repaid from future deposits, often by automatic debit. | Short, specific gaps when your deposits are steady and you have several customers; often decided faster than a bank. | Total cost is generally higher than a bank line; daily debits can clash with lumpy progress payments; stacking several is dangerous. |
When you compare offers:
- Ask for the total repayment in dollars, not a rate or a factor. "You get $100,000 and repay $X over Y weeks" is the comparison that matters.
- Ask for the payment amount and frequency. Daily, weekly, monthly.
- Ask about early payoff. Does paying early reduce the total?
- Ask for the written disclosure. In many states, including New York, California, Virginia, Georgia, Florida, Texas and Louisiana, providers must give a standardized disclosure with an offer. Read how to read a commercial financing disclosure.
Full comparison: cash advance vs line of credit vs factoring.
Step 4: Match the payment schedule to your cash cycle
The biggest mistake contractors make with short-term funding isn't the cost. It's taking money with a payment schedule that doesn't match how they get paid.
- Your income is lumpy. A big check every few weeks.
- Daily debits are smooth. They come out every business day, including the 40 days before the next check.
Before you sign anything, put the payments into your week-by-week map from Step 1:
- Does the running total still stay above zero (or above your minimum comfortable balance) in the weeks before each check?
- If the next GC payment is 30 days late, can you still make the payments and payroll?
- If the answer is no, ask for a different schedule (for example weekly instead of daily) or a smaller amount, or choose a different product.
Crossbrace Capital offers both weekly and daily schedules, and for contractors we lead with weekly. Compare the two in daily vs weekly remittance.
Step 5: Stop it from happening on the next job
- Bid the cost of money. If a job will tie up $300,000 for ten weeks, the cost of carrying that is a real job cost. Put it in the bid.
- Build a payroll reserve. Even four weeks of payroll in a separate account changes your options.
- Open a line of credit when you don't need it. Banks lend most easily to businesses that don't look urgent.
- Diversify your payers. A mix of GCs plus service or maintenance work smooths deposits. It also makes you a better candidate for every kind of funding.
- Track days-to-pay by GC. After a year you'll know who pays in 40 days and who pays in 90, and you can price or pass accordingly.
When an advance is the wrong answer
We're a direct funder, and we'll still tell you: an advance isn't right for every payroll gap.
- If the gap is permanent, meaning every job runs negative and the business is losing money, funding will only delay the problem. Talk to your CPA.
- If you haven't added up the payments you already make, do that first. Existing advances don't rule you out, but every payment has to fit in your weekly map. See stacking risks explained.
- If you're waiting on one large payment from one customer, receivables financing (which we offer), factoring or a contract-specific line is built for that.
- If a bank line is available to you, it's almost always cheaper.
If you're in one of those spots, we'd rather you hear it from us than find out later. If you're an electrical contractor, our trade page shows how this plays out on a real-world-sized job.
Checklist
- Map each active job week by week; find the peak and the week it hits (calculator)
- Re-run with your slowest GC's real pay history
- Submit pay apps on day one, with complete backup; bill stored materials where allowed
- Ask suppliers for net 30–60 or joint checks on large orders
- Never use payroll tax deposits to cover wages
- Compare outside options by total dollars repaid, payment amount and frequency
- Put the payment schedule into your weekly map before signing
- Get the written disclosure and read it line by line
- Bid the cost of carrying the job into the next estimate
See your gap, then talk it through
Run your job through the cash-gap calculator. If the gap is real and your deposits are steady, tell us about it. We'll tell you honestly whether our funding fits.
Talk through your payroll gapFind your cash gapThis guide is general information, not legal, tax or financial advice. Talk to your CPA or attorney about your situation.