Finishers leveling a fresh concrete slab while a pump boom places concrete (illustrative photo)
Illustrative photo

For commercial concrete, foundation and flatwork contractors

Working capital for concrete contractors

You can form, pour and finish an entire building's concrete in ten weeks and still be waiting on the first check. Crossbrace Capital helps established concrete contractors cover ready-mix, rebar, pumps and crews while the pay apps catch up, with a plain-dollar cost disclosure in states that require one.

5 taps. No contact details to see your number.

Check your cash gap

Up to 5 taps to an estimate. No contact details needed to see it.

Let's size the cash gap on a job. 5 taps at most, and you don't need to give contact details to see the number. Nothing is sent to us until you press Send at the end.

Start

Prefer a regular form?

  • Commercial contractors onlyWe don't fund consumers or household needs
  • No SSN to startThe first step asks about your business and the job
  • SMS consent is never precheckedYou choose whether we text you
  • Plain-dollar disclosureWritten cost disclosure where state law requires one

Finished before you're paid

Concrete work is short and intense. Footings, foundation walls, slab on grade, elevated decks and site flatwork can run on a tight sequence, with big crews and big material deliveries every pour day. Then you move on.

Most other trades are on a job long enough that early checks start paying for later work. On a short concrete job, that doesn't happen. You can carry 100% of the job's cost before a single dollar comes back.

Typical job: a $540,000 structural and flatwork package

A hypothetical concrete package for a one-story commercial building:

  • $540,000 contract over 10 weeks
  • Ready-mix, rebar and embeds at 42% of the contract
  • $19,000 a week in burdened payroll plus $5,000 a week for pumps, forms and finishing equipment
  • Pay app every 4 weeks, net 45, 10% retainage released 60 days after completion

What the calculator shows:

  • Peak cash gap: about $467,000, in week 10. That's the whole cost of the job. You finish before the first check arrives.
  • First check: about $194,000, in week 11.
  • Three checks in weeks 11, 15 and 17, then $54,000 of retainage around week 19.
  • Margin: about $73,000 (13.6%), paid out over the nine weeks after you leave.
Hypothetical example
Peak cash gap$467,000week 10
First check$194,000week 11
Retainage held$54,000released week 19
Margin$73,00013.6% of the contract
Paid out that weekPayment receivedRetainage releasedRunning cash positionYour cash gap

Run your own job

What changes if you bill every two weeks

Same job, same costs. The only changes: you bill every two weeks instead of every four, and the GC pays in 30 days instead of 45.

Bill every 4 weeks, net 45 Bill every 2 weeks, net 30
Peak cash gap about $467,000 (week 10) about $298,000 (week 6)
First check about $194,000 (week 11) about $97,000 (week 7)
Number of checks 3 plus retainage 5 plus retainage

Negotiating billing frequency and terms cut the peak gap by about $169,000 in this example, more than twice the job's margin (computed). It's worth asking for before you sign, and worth asking about before you look at any kind of funding. More on this in how much working capital a job needs.

Run both versions Open the calculator with this example

Your pay timeline

Example timeline: concrete jobHypothetical $540,000, 10-week job billed every 4 weeks on 45-day terms with 10% retainage. Peak gap about $467,000 in week 10.
  1. Week 0Forms and rebarCrew, pump, ready-mix
  2. Week 4You billPay app for placed work
  3. Week 10GC gets paidOwner pays the GC
  4. Week 11You get paidLess retainage
  5. Week 19Retainage releasedAfter closeout
Week-by-week table
When Field Cash
Week 0 Mobilize forms, pump and finishing equipment, layout Mobilization costs (see the checklist)
Weeks 1–3 Footings and foundation walls; first rebar and ready-mix deliveries Supplier invoices start
Week 4 Slab prep; first pay app goes in Nothing in yet
Weeks 5–10 Slab on grade, decks, site flatwork Payroll and ready-mix every week
Week 10 Demobilize; final pay app Peak gap
Weeks 11–17 Next job Three checks
Around week 19 Flatness, cracking or punch items resolved Retainage

Weather, cold-weather costs and pour-day risk

  • Cold weather

    The American Concrete Institute's guide defines cold weather as air temperature at or below 40°F during the protection period (ACI 306R-16 excerpt, accessed 2026-11-17). Blankets, heaters, enclosures and accelerators cost money on the day, whether or not your bid included them.

  • Rain-outs

    A cancelled pour still leaves a crew to pay and can shift the whole sequence.

  • Supplier terms

    Ready-mix and rebar suppliers set their own terms, and many want to be paid well before your GC pays you.

  • Pump and equipment rentals

    Billed whether the pour happens or not.

  • Back-charges

    Flatness, cracking or finish disputes can turn into back-charges against your final payment or retainage.

  • Notice and lien deadlines

    If you're unpaid, your rights depend on dates that start running from your first or last day on the job. In Ohio, for example, a notice of furnishing is due within 21 days of first work on many projects (Ohio Rev. Code 1311.05, accessed 2026-11-17). See the GC slow-pay playbook. Not legal advice.

Nationally, poured-concrete foundation and structure contractors employed about 246,000 people in Q1 2026, up 1.5% from a year earlier (BLS QCEW, NAICS 23811, 2026 Q1, retrieved 2026-11-17).

Questions we ask concrete contractors

Send a request

  1. What's the pour schedule, and when do you finish on site?
  2. What are your ready-mix and rebar supplier terms?
  3. How often can you bill, and what are the GC's payment terms?
  4. What's your retainage, and what punch or flatness requirements gate it?
  5. How have your business deposits looked over recent months, including winter?
  6. Any existing advances or loans with daily or weekly payments?

Fit and no-fit

Usually a fit

Established commercial concrete contractors with steady deposits, signed work and a gap that ends with a known pay app. One year in business is our only published minimum, and existing advances don't rule you out.

Usually not a fit

A gap you could close by negotiating billing frequency, a disputed back-charge that may not resolve, or a slow winter with no work lined up. Supplier terms or a bank line may also be cheaper (compare the options).

Product note: Crossbrace Capital is a direct funder. We fund concrete contractors two ways: business funding repaid on a weekly or daily schedule (for contractors, we lead with weekly), and receivables financing against invoices and pay apps you've already billed. Costs and terms depend on your business and are set out in writing before you sign.

FAQ

Why is my cash gap so big on such a short job?

Because you finish before you're paid. On a 10-week job billed monthly at net 45, nothing comes back until week 11, so you carry the whole cost.

Should I ask the GC for two-week billing?

If the contract allows it, it's one of the biggest levers you have. In our example it cut the peak gap by about $169,000.

Can funding cover ready-mix and rebar for a signed job?

If materials for signed work are an approved use, yes. Compare against supplier credit first.

What about cold-weather costs that weren't in my bid?

They're a real cash hit. Tell us about them; we look at whether your billings carry the job with them included.

Do I need to give my SSN to start?

No.

What does it cost?

It depends on the file. Ask for the total cost in dollars and the payment schedule before you sign. Required disclosures are provided in states that require them.

Know your gap. Then talk to us.

Tell us about the job. If we're not the right fit, we'll say so.

No SSN, date of birth or bank login to start.

Check cash gapCall