Funding for the trades we work with

Trade contractors carry payroll, materials and mobilization for weeks before a pay app turns into cash. Pick your trade to see where the gap comes from, what owners use funding for, and when funding isn't the right tool.

Electrician on a scissor lift routing copper conductors into an open panel (illustrative photo)

Electrical

Gear deposits, long-lead switchgear and weekly payroll before a 45-day pay app. How electrical subs size the gap and read an offer before signing.

Read the full Electrical pageTry the $720,000 electrical example

Two HVAC technicians guiding a rigged rooftop unit onto its curb (illustrative photo)

Mechanical and HVAC

Equipment releases, startup and commissioning holds, and net-60 pay apps. How mechanical and HVAC contractors plan the cash gap on a commercial install.

Read the full Mechanical and HVAC pageTry the $650,000 mechanical example

Excavator digging a utility trench while a foreman signals beside stacked pipe (illustrative photo)

Site work and utility

Equipment, fuel and crews burn cash from day one. How site-work and utility contractors cover the front of a job, unit-price billing and public retainage.

Read the full Site work and utility pageTry the $900,000 site-work example

Plumber tightening a fitting in a mechanical room lined with copper and cast-iron pipe (illustrative photo)

Plumbing

Underground and rough-in come first; trim and fixtures come months later. How commercial plumbers carry the gap between inspections and pay apps.

Read the full Plumbing pageTry the $380,000 plumbing example

Finishers leveling a fresh concrete slab while a pump boom places concrete (illustrative photo)

Concrete

On a short pour schedule the whole job can be finished before the first check arrives. How concrete contractors cover ready-mix, rebar, pumps and crews.

Read the full Concrete pageTry the $540,000 concrete example

Low-voltage technician dressing blue network cable into patch panels (illustrative photo)

Low-voltage and data cabling

Third-tier contracts, net-60 terms and testing that gates closeout. How low-voltage and cabling contractors carry labor and cable between pay apps.

Read the full Low-voltage and data cabling pageTry the $210,000 low-voltage example

Driver doing a pre-trip walkaround of a dump truck at an aggregate yard (illustrative photo)

Construction hauling

Diesel, drivers and repairs get paid weekly; haul tickets get paid in 30 days or more. How haulers size the gap, and when factoring fits better.

Read the full Construction hauling pageTry the 12-week hauling example

Not on the list?

Owners in other trades, and electrical and building supply distributors, can still send a request and pick their trade on the first screen.

Not sure? Use the calculator

If you want a number before you talk to anyone, the free contractor cash-gap calculator shows the most cash a job will tie up, and the week it hits. No email needed.