The gear shows up in week 3. The first check shows up in week 11. Crossbrace Capital helps established electrical contractors carry switchgear, wire and payroll through that stretch, with a plain-dollar cost disclosure in states that require one.

5 taps. No contact details to see your number.

Check your cash gap

Up to 5 taps to an estimate. No contact details needed to see it.

Let's size the cash gap on a job. 5 taps at most, and you don't need to give contact details to see the number. Nothing is sent to us until you press Send at the end.

Start

Prefer a regular form?

  • Commercial contractors onlyWe don't fund consumers or household needs
  • No SSN to startThe first step asks about your business and the job
  • SMS consent is never precheckedYou choose whether we text you
  • Plain-dollar disclosureWritten cost disclosure where state law requires one

The electrical cash curve

On most electrical jobs, the biggest checks you write come early. Switchgear, panelboards, transformers, lighting packages and wire are ordered or deposited before rough-in is done, and suppliers want their money on their terms, not your GC's. Meanwhile your schedule of values usually lets you bill gear only when it is delivered and stored, or installed, depending on what the contract says about stored materials.

So the electrical cash curve has a hump: heavy outflow in the first month, payroll every week after that, and the first pay-app check arriving around week 10 or 11 on net 45. The hump is the number to plan for.

Typical job: a $720,000 gear-heavy scope

Here is a hypothetical tenant-improvement-to-core electrical package, run through the same math as our calculator:

  • $720,000 contract over 20 weeks
  • Materials at 45% of the contract, with 60% of that bought in the first three weeks
  • $16,000 a week in burdened payroll
  • Pay app every 4 weeks, paid net 45, with 10% retainage

What the calculator shows:

  • Peak cash gap: about $419,000, in week 10. That is how much of your own money (or someone else's) is in the job before the first check clears.
  • First check: about $130,000, in week 11. That's 90% of what you billed in week 4, after retainage.
  • Retainage: $72,000, released around week 29, two months after you finish.
  • Margin on the job: about $76,000 (10.6%). The peak gap is more than five times the profit, which is why a profitable job can still run you out of cash.

Change any number in the calculator to match your job. Open the calculator with this example

Hypothetical example
Peak cash gap$419,000week 10
First check$130,000week 11
Retainage held$72,000released week 29
Margin$76,00010.6% of the contract
Paid out that weekPayment receivedRetainage releasedRunning cash positionYour cash gap

Run your own job

On a data-center or substation job? See electrical subs on data-center work.

Your pay timeline

A typical commercial electrical job, week by week (based on the example above; your contract governs):

Example timeline: electrical jobHypothetical $720,000, 20-week job billed every 4 weeks on 45-day terms with 10% retainage. Peak gap about $419,000 in week 10.
  1. Week 0Rough-in startsCrew, wire, gear deposits
  2. Week 4You billPay app for rough-in
  3. Week 10GC gets paidOwner pays the GC
  4. Week 11You get paidLess retainage
  5. Week 29Retainage releasedAfter closeout
Week-by-week table
When What happens Cash
Week 0 Contract signed, submittals start Bonds, insurance certificates, submittal labor
Weeks 1–3 Gear released and deposited, wire and rough-in material bought Largest outflow of the job
Week 4 First pay app goes in (rough-in plus any stored materials the contract allows) Nothing in yet
Weeks 4–10 GC reviews, owner approves, owner pays GC, GC pays you Payroll every week
Week 11 First check, minus 10% retainage First money in
Weeks 15, 19, 23, 27 Monthly checks continue Gap shrinks
Week 20 Job complete, punch list, closeout docs Final pay app
Around week 29 Retainage released (if closeout is clean) Last money in

Industry data backs up that lag: subcontractors reported waiting 51 days on average to be paid (Billd 2026 Market Report, accessed 2026-11-17), and 92% of subcontractors surveyed floated payroll at least once in the prior year (Siteline, accessed 2026-11-17).

Where electrical jobs pinch

  • Gear deposits and long-lead releases

    Switchgear and transformer orders often require a deposit or full payment before your stored-materials billing is approved. Ask early whether your contract allows billing for gear stored off site, and what proof (insurance, bill of sale, photos) the GC needs.

  • Wire price moves

    Copper-heavy scopes can change cost between bid and buy. Lock pricing with your supplier where you can.

  • Overtime to hit an energization date

    Owners push for early power. Overtime hits payroll this week; the extra billing gets paid next month.

  • Change orders worked before they're signed

    Common on fast-track jobs. Unsigned change-order work can't go on a pay app.

  • Retainage held after you're done

    Electrical is often one of the last trades off site, so your retainage is tied to the whole job's closeout. Retainage caps and release deadlines vary by state; see retainage laws by state.

Data-center and tiered work

Data-center construction is pulling a lot of electrical work. US private data-center construction spending was running at a seasonally adjusted annual rate of about $96.5 billion, up roughly 90% from a year earlier (U.S. Census Bureau, C30 private construction, September 2026 data, accessed 2026-11-17). But that work is concentrated: in an April 2026 survey, 42% of contractors with $100 million or more in revenue reported data-center work, compared with 7% of smaller firms (Associated Builders and Contractors, accessed 2026-11-17).

Employment in nonresidential electrical contracting grew 6.4% year over year nationally, to about 803,000 workers in Q1 2026 (BLS QCEW, NAICS 238212, 2026 Q1, retrieved 2026-11-17).

For a mid-size electrical sub, that usually means working as a second- or third-tier sub on these jobs. Each tier adds a review step and often a pay-when-paid clause, which stretches your timeline. If you're on a pay-when-paid or pay-if-paid contract, read pay-when-paid vs. pay-if-paid before you sign.

Crossbrace Capital is not affiliated with any data-center owner, developer or general contractor.

Questions we ask electrical contractors

We ask these so we can tell you quickly whether funding fits, or whether something else would work better:

Send a request

  1. What's the job, and what's your contract value and schedule?
  2. How much of the materials budget is gear, and when does it have to be paid?
  3. Does your contract allow billing for stored materials? On site only, or off site too?
  4. What are your billing terms, retainage percentage and pay-when-paid language?
  5. What does your monthly deposit history look like over the last several months?
  6. Do you have any existing advances or loans with daily or weekly payments?
  7. What's your backlog beyond this job?

Who this fits and who it doesn't

Usually a fit

Established commercial electrical contractors with consistent business deposits, signed work, and a gap with a clear end date (a pay app, a draw or a retainage release). One year in business is our only published minimum, and existing advances don't rule you out.

Usually not a fit

A business under 1 year old, or a gap with no clear end. If the gap is one big pay app from one GC, ask about our receivables financing instead. If an SBA loan, a bank line of credit or supplier terms would cover the need at a lower cost, we'll say so. See how the options compare.

Product note: Crossbrace Capital is a direct funder. We fund electrical contractors two ways: business funding repaid on a weekly or daily schedule (for contractors, we lead with weekly), and receivables financing against invoices and pay apps you've already billed. Costs and terms depend on your business and are set out in writing before you sign.

FAQ

Can I use working capital to pay a switchgear deposit?

Generally yes, if materials for a signed job are an approved use of funds. Before you do, check whether your contract allows billing for stored gear, because that decides how fast the deposit comes back to you.

How do you look at a job with 10% retainage?

We treat retainage as money you've earned but won't see until closeout. In our example, $72,000 of a $720,000 job came back about 9 weeks after completion. We look at whether the rest of your billings carry the job without it.

I'm a third-tier sub on a data-center job. Does that matter?

It changes the timeline, not the fit by itself. More tiers usually mean more review steps and more pay-when-paid exposure, so we ask to see the payment terms in your subcontract.

Do I need to give my SSN or connect my bank to start?

No. The first step asks about your business and the job.

What will it cost?

It depends on your business, the amount and the term. Ask for the total cost in dollars, and how payments come out, before you sign. Required disclosures are provided in states that require them. We don't publish rates because they vary by file.

What if a line of credit would be cheaper?

Then you should use it. A bank line is usually less expensive if you qualify and it's big enough. We'll tell you if we think that's your better option.

Know your gap. Then talk to us.

Tell us about the job. If we're not the right fit, we'll say so.