Power generation and grid
Financing for contractors on power plant, substation and transmission jobs
Private spending on power construction ran at a $171.7 billion annual rate in September 2026, up 12% from a year earlier. Electric power alone was $146.9 billion, up 14% (U.S. Census Bureau, private construction table, released Nov 2, 2026). That makes power the largest growing category in U.S. construction.
Crossbrace Capital is a sister company of Funding Futures and a direct funder for construction contractors. We fund contractors on approved work, in whatever form fits the job. Crossbrace Capital isn't affiliated with any company or project named on this page.
5 taps. No contact details to see your number.
Check your cash gap
Up to 5 taps to an estimate. No contact details needed to see it.
Let's size the cash gap on a job. 5 taps at most, and you don't need to give contact details to see the number. Nothing is sent to us until you press Send at the end.
Your request is handled by Crossbrace Capital and its sister company Funding Futures, and either may call or email you about it. We do not sell your information. By pressing Send my request, I confirm I'm authorized to request business funding for this business and that it's for business purposes only. Automated calls and texts happen only if I checked those boxes. Privacy Policy · Terms · Disclosures
What's being built
| Project | What | Status | As of | Source |
|---|---|---|---|---|
| Homer City Energy Campus, PA | Up to 4.4 GW gas plant; seven GE Vernova 7HA.02 turbines | First two turbines delivered and set in late September 2026; more than 2,000 tradespeople and contractors on the project | Nov 2026 | Homer City Generation release |
| Smarr combined-cycle plant, Monroe County, GA | 1,425 MW gas plant; $3.3B federal loan | Ground broken in May; operation expected 2029 | Oct 15, 2026 | America's Electric Cooperatives |
| Vicksburg Advanced Power Station, MS | 754 MW gas plant, $1.2B | Ground broken October 2025; more than 560 construction jobs | Oct 2025 | The Sun-Sentinel |
| Palisades, MI; Crane, PA; Duane Arnold, IA | Nuclear plant restarts | Palisades and Crane targeted for 2027; Duane Arnold by early 2029 | Oct 16, 2026 | AP |
| Plant Bowen, Bartow County, GA | About 1,500 MW of gas plus 500 MW of battery storage | Ground broken July 28, 2026 | Aug 3, 2026 | Georgia Power; Black & Veatch |
Announced
| Project | What | Status | As of | Source |
|---|---|---|---|---|
| Bison, Ray, ND | 1.49 GW gas plant | Announced; construction was planned to start in Q3 2026 | Jun 2026 | Industrial Info Resources |
Census doesn't report transmission lines and substations separately; they sit inside the electric line above.
Which trades carry the most cash
- Electrical and I&C. Large wire, cable tray, switchgear and controls, plus commissioning that can run for months before final payment.
- Pipefitters and boilermakers. Heat-recovery steam generators, process and steam piping, with welding crews paid weekly.
- Civil and concrete. Turbine foundations, duct banks and substation pads are early on the schedule, so these trades often go longest before the first payment.
- Substation and line crews. Equipment and crews committed ahead of energization milestones.
Where the cash gap comes from on power jobs
- Materials and equipment before billing. Large orders can come due before your first pay app is approved. See long-lead equipment deposits.
- Milestone billing. Some contracts pay on milestones rather than monthly progress, which stretches the gap between payroll and payment.
- Retainage held to substantial completion or energization. See retainage laws by state.
- Travel. Plants are often rural, so per diem and lodging start on day one. See mobilizing a traveling crew.
How we look at a power-plant request
We look at your business and the job: how long you've operated, your revenue and deposits, the contract and who pays it, what's billed and unpaid, your payment clause and the retainage. There's no SSN, date of birth or bank login at the first step.
Size your gap
FAQ
Do you work with the companies building these plants?
No. Crossbrace Capital isn't affiliated with any owner, utility or contractor named here. We fund contractors directly.
I'm a tier-2 or tier-3 sub on a utility job. Can I still apply?
Yes. Tell us who pays you and what your payment clause says.
Do I need a signed subcontract to start?
A contract or purchase order and your recent pay apps help most. You don't need to send anything to see your estimate.
Related: Where the work is · Electrical contractors · HVAC and mechanical contractors · Site work and utility contractors · Data centers