Two LNG export terminals are under construction in southwest Louisiana, and a third reached its final investment decision in May 2026. Two of them alone are worth more than $41 billion by their developers' stated figures (sources below). These are multi-year, lump-sum builds, and the cash pressure flows down the chain to the trades.

Crossbrace Capital is a sister company of Funding Futures and a direct funder for construction contractors. Crossbrace Capital isn't affiliated with any company or project named on this page.

5 taps. No contact details to see your number.

Check your cash gap

Up to 5 taps to an estimate. No contact details needed to see it.

Let's size the cash gap on a job. 5 taps at most, and you don't need to give contact details to see the number. Nothing is sent to us until you press Send at the end.

Start

Prefer a regular form?

What's being built

Project What Status As of Source
CP2 LNG, Cameron Parish Up to 28 MTPA, 36 modular trains; about $28B (phase 1: $15.1B) Construction "well underway": 16 modules on site, roofs raised on all four tanks; first exports expected in the second half of 2027 Aug 26, 2026 ENR
Louisiana LNG, near Lake Charles Three-train foundation phase 32% complete; Train 1 41% complete; first LNG targeted 2029 Sep 30, 2026 Woodside Q3 2026 report

Approved, not yet under construction

Project What Status As of Source
Commonwealth LNG, Cameron Parish 9.5 MTPA, $13B; Technip Energies EPC Final investment decision May 2026; first LNG targeted 2030 May 20, 2026 JPT

Southwest Louisiana: Calcasieu and Cameron parishes

"More than $41 billion" is CP2's $28 billion estimate plus Commonwealth's $13 billion. Woodside's Q3 report gives no total for Louisiana LNG, so it's left out of the sum.

The local labor picture

Specialty trade contractor employment in Calcasieu Parish was down 8.5% in March 2026 from March 2025, at 3,662 jobs against 4,002 (BLS QCEW, Calcasieu). Cameron Parish doesn't publish that figure (BLS QCEW, Cameron). QCEW also counts jobs where the employer reports them, not where crews work, so crews who travel in are counted in their home county. Treat the percentage as direction, not precision.

Who actually pays you on a megaproject

On an LNG terminal the chain runs owner → EPC contractor → trade contractors → you. Every tier adds a review step before money moves.

  • Get the payment chain in writing. Know which company signs your subcontract and pays your invoices. It may be a project company, not the name on the sign.
  • Ask about pay terms, retainage and the payment clause before you mobilize. See pay-when-paid vs pay-if-paid.
  • If payments start running late, see the GC slow-pay playbook.

Louisiana's payment rule changed in 2026

Louisiana's Act 822 took effect August 1, 2026 for private construction. Owners generally must pay a contractor's proper payment request within 35 days, and contractors and subcontractors now have 7 days (down from 14) after they're paid to pay the next tier (Act 822 of 2026; Cozen O'Connor, Oct 28, 2026). That helps once money starts moving. It doesn't change how long you wait for the owner to pay the top of the chain.

The statute (La. R.S. 9:2784) also lists exclusions, including some oil, natural gas and chemical agreements and pipeline facilities, so ask a Louisiana construction attorney whether it covers your job. This is general information, not legal advice.

Which trades carry the most cash

  • Pipe fabrication and welding. Alloy pipe and spools, with weld crews paid weekly.
  • Structural steel and modules. Steel bought and erected ahead of milestone billing.
  • Insulation, heat tracing and scaffolding. Large crews, late in the sequence.
  • Electrical and I&C. Cable, MCC rooms and loop checks through commissioning.

Where the cash gap comes from on LNG jobs

  • Lump-sum EPC contracts. Cost pressure at the top flows down the chain.
  • Milestone and module billing rather than steady monthly progress.
  • Retainage and back-charges held until turnover.
  • Travel and housing for crews brought in to the Gulf Coast. See mobilizing a traveling crew.

Size your gap

FAQ

Do you work with the terminal developers or their EPCs?

No. Crossbrace Capital isn't affiliated with any company named here.

My contract is with a fabrication shop, not the EPC. Can I apply?

Yes. Tell us who pays you, your payment clause and what's billed and unpaid.

Does the 7-day rule mean I get paid in 7 days?

No. It's the time your customer has after it gets paid. The owner's 35-day clock and any exclusions in the statute still apply.

Related: Where the work is · Plumbing contractors · Electrical contractors · GC slow-pay playbook

Sources checked November 18, 2026.

Check cash gapCall