Spending on chip, electronics and battery plants fell to a $52.6 billion annual rate in September 2026, down 42% from a year earlier (U.S. Census Bureau, private construction table, released Nov 2, 2026). That drop is mostly the big shells finishing. Inside them the trade work keeps going: cleanrooms, process piping, ultrapure water, gases, exhaust and power.

Crossbrace Capital is a sister company of Funding Futures and a direct funder for construction contractors. Crossbrace Capital isn't affiliated with any company or project named on this page.

5 taps. No contact details to see your number.

Check your cash gap

Up to 5 taps to an estimate. No contact details needed to see it.

Let's size the cash gap on a job. 5 taps at most, and you don't need to give contact details to see the number. Nothing is sent to us until you press Send at the end.

Start

Prefer a regular form?

What's being built

Project What Status As of Source
TSMC Arizona, Phoenix, AZ $165B program: six fabs, two advanced packaging plants, an R&D center Fab 3 topped out and construction has started on the fourth fab; more than 20,000 construction jobs on the first three May 5, 2026 City of Phoenix
Intel Fab 62, Ocotillo campus, AZ Intel's sixth high-volume fab at Ocotillo Construction and tool installation underway; operations expected by the end of 2028 2026 Intel
Micron ID1 and ID2, Boise, ID Two memory fabs, about $50B combined First wafers from the first fab expected mid-2027; the second fab expected to become operational near the end of 2028 May 30, 2026 Idaho Statesman
Micron, Clay, NY $100B campus First concrete poured July 9, 2026; Bechtel named EPC for phase 1; over 4,500 construction jobs expected Jul 13, 2026 Construction Dive; Micron
Intel Ohio One, New Albany, OH First Ohio fab First major structural truss installed; Intel gives no date 2026 Intel

The size of the trade packages: Boise city records cited by ENR show a $220 million mechanical, electrical and plumbing package for one building at Micron's Boise campus and a separate $149 million package for utility trestles (ENR, Aug 20, 2026).

Which trades carry the most cash

  • Ultra-high-purity and process piping. Specialty materials, cleanroom procedures and QA testing before acceptance.
  • Electrical. Utility substations, distribution and tool hookup.
  • Mechanical and HVAC. Make-up air, exhaust and cleanroom air handling.
  • Fire protection and controls. Late in the schedule, with acceptance tied to commissioning.

Where the cash gap comes from on fab jobs

How we look at a fab request

The same as any construction request: time in business, revenue and deposits, the contract and who pays it, what's billed and unpaid, your payment clause and the retainage. There's no SSN, date of birth or bank login at the first step.

Size your gap

FAQ

Are you connected to TSMC, Intel or Micron?

No. Crossbrace Capital isn't affiliated with any company named here.

I'm a tier-2 sub to an MEP contractor. Does that matter?

Tell us who pays you and what your payment clause says. Pay-when-paid and pay-if-paid clauses change how we look at the receivable.